Paste your Google Webmaster Tools verification code here

Drying in the House

Now that the floor is done I don’t want it to be exposed to the weather for too long. I set up plastic sheeting to keep the floor dry while I built the front and back walls and then plywood the knee wall.

This was the first time that I could see and get a feel for what the center of the house was going to be like

Standard wall framing. 2 picture windows, the front door and a upper window to let in light still yet to be framed. I could have built the wall all in one shot from the roof truss down to the floor but decided to build it in two stages.

I attached wood 2×4’s to the underside of the metal truss with screws to make it easier for framing the upper half of the wall.

Here’s the wall all done before outer sheathing.

If you look closely at the front wall you can see 2 black bars that go from the floor up to the truss. Those are 2″ square tubing I added for rigidity in the wall. It was probably not needed but it made me feel better.

Here it is after and with windows installed.

I used screws to attach the plywood to the knee walls.

Here’s the back wall that sits above the back two containers creating a loft area.

It’s all dried in and starting to resemble a house.( At least in my mind…lol)

If you have any questions I would love to hear from you.

Subscribe To Our Newsletter

 

Join our mailing list to receive the latest news and updates from our blog.

You have Successfully Subscribed!

Pin It on Pinterest

Share This