by Silvio Domingues | May 17, 2020 | post, Shipping Container House
Drying in the House Now that the floor is done I don’t want it to be exposed to the weather for too long. I set up plastic sheeting to keep the floor dry while I built the front and back walls and then plywood the knee wall. This was the first time that I could...
by Silvio Domingues | May 10, 2020 | post, Shipping Container House
Building the Floor I needed to build a floor between the containers which would wind up being the main floor area of the house. One end closest to the back would be Kitchen area and the other end would be living room. Both ends would be divided by a large stone faced...
by Silvio Domingues | Apr 29, 2020 | post, Shipping Container House, Special Projects
Installing Roof I connected the trusses together with 2×6’s as per the design of the trusses. I then laid down the plywood and nailed it to the 2×6’s. I then hired a local roofing contractor to come professionally install the metal roofing. All...
by Silvio Domingues | Aug 2, 2018 | Honda XR600R, My Babblings, post, Special Projects
Honda XR600R Honda XR600R – It’s finally here! I have wanted a Honda XR600R for many years now, ever since I rode my first one that is owned by my buddy Mike. It’s name is Stampy, named after the elephant in a Simpsons episode because it would go up...
by Silvio Domingues | Jan 19, 2018 | How To's, post
In this video I go over the steps needed for removing the old primer from the brass case in the reloading process....